near-critical activity
An activity that has low total float.
near-term activities
Activities that are planned to begin, be in process, or be completed during
a relatively short period of time, such as 30, 60, or 90 days.
needs
Also requirements, the OwnerÍs or userÍs requirements to be satisfied by
a proposed facility. In the conceptual design stage the needs are analyzed and
formulated into a functional program. In the planning and development phase the
needs are translated into a project brief.
needs study
A study focused specifically on the needs and requirements for a project
either before or after a project has been launched, i.e. it may be a very early
part of the project life cycle.